We are thrilled to showcase the remarkable construction progress of our Alinda Villas project!

FOUNDATION FOOTING PROCESS 100 %

STRUCTURE PROCESS 93%

– GROUND BEAM STRUCTURE PROCESS 95%

STRUCTURE PROCESS 93%

– POOL AND SURGE TANK STRUCTURE PROCESS 92%

STRUCTURE PROCESS 93%

– COLUMN 95 %

STRUCTURE PROCESS 93%

– ROOF BEAM AND SLAB 90%

ARCHITECTURAL PROCESS 5 %

– BRICK WORK 25 %

ARCHITECTURAL PROCESS 5 %

– PIPE LINE INSTALLATION 30 %

ARCHITECTURAL PROCESS 5 %

– PAINTING WORK 0 %
– PLASTERING WORK 0 %
– FINISHING & MATERIAL INSTALLATION WORK 0 %

STATUS SUMMARY

FOUNDATION FOOTING PROCESS 100 %

STRUCTURE PROCESS   93 %

– GROUND BEAM AND FLOOR STRUCTURE PROCESS   95%
– POOL AND SURGE TANK STRUCTURE PROCESS         92%
– COLUMN                                                                              95%
– ROOF BEAM AND ROOF SLAB                                          90%

ARCHITECTURAL PROCESS      11 %

– BRICK WORK       25%
– PIPE LINE INSTALLATION        30%
– PLASTERING WORK                 0%
– FINISHING & MATERIAL INSTALLATION WORK     0%
– PAINTING WORK                       0%

DECORATIVE WORK AND TRANSFER PROCESS 0 %











Our project credentials speak volumes:
• A strong commitment to quality and excellence.
• A highly skilled and experienced construction team.
• A vision for creating exceptional living spaces that exceed expectations.
• A relentless pursuit of innovation and sustainability in construction practices.
Together, we are transforming visions into reality at Alinda Villas
The project is located in the popular Expat area of Thalang, 10 minutes from Boat Avenue and 12 minutes from Layan Beach.
📞 For more information:
Whatsapp: +66818974180
📍 Start price 29 M.THB
Modern tropical @Thoong Thalang